Shifts in specific period – KYORITSU 6315 Instruction Manual User Manual
Page 105

Shifts in specific period
-
Shifts in specific period
Items displayed on the LCD
Remaining time
(time left)
Demand interval is counted down.
DEM P
Percentage of the present value against the target value.
Present value
Target value
is displayed.
DEM G
Percentage of the predicted value against the target value.
Predicted value
Target value
is displayed.
When the predicted value
exceeds the target value
during demand measure-
ments, the warning buzzer
sounds at the inspection
cycles.
Inspection
cycle
KEW6315
103 -
KEW6315
Items displayed on the LCD
Demand interval is counted down.
Percentage of the present value against the target value.
is displayed.
Percentage of the predicted value against the target value.
is displayed.
Meas. cycle
Save point
Time left
Predicted value
Present demand
value
Target value
Inspection
cycle
Inspection
cycle
- 1009 (13 pages)
- 1011 (12 pages)
- 1012 (12 pages)
- 1018 (1 page)
- 1030 (1 page)
- 1061 (58 pages)
- 1051 (40 pages)
- 1109S (36 pages)
- 1110 (1 page)
- 2000 (1 page)
- 2002PA (27 pages)
- 2007A (1 page)
- 2009R (33 pages)
- 2012R (2 pages)
- 2017 (1 page)
- 2031 (1 page)
- 2033 (9 pages)
- 2040 (2 pages)
- 2046R (2 pages)
- 2200 (3 pages)
- 2210R (1 page)
- 2300R (1 page)
- 2413F (24 pages)
- 2413R (24 pages)
- 2431 (2 pages)
- 2432 (1 page)
- 2433R (1 page)
- 2434 (10 pages)
- 2500 (1 page)
- 2608A (2 pages)
- 3005A (24 pages)
- 3021 (24 pages)
- 3121A (12 pages)
- 3126 (28 pages)
- 3127 (60 pages)
- 3128 (88 pages)
- 3131A (20 pages)
- 3132A (20 pages)
- 3161A (24 pages)
- 3321A (24 pages)
- 4105A (10 pages)
- 4106 (48 pages)
- 4116A (20 pages)
- 4140 (32 pages)
- 4200 (24 pages)