beautypg.com

Occupy control setup, Occupy control point – Spectra Precision Survey Pro v4.5 Recon and Nomad Reference Manual User Manual

Page 254

background image

Survey Pro Reference Manual

R-246

Occupy Control Setup

The Occupy Control Setup screen is used to specify

which job point with accurate NEE coordinates you are

occupying and if you want to use the point for horizontal
and/or vertical control when localizing (this can be

changed later).

Point

: is the existing job point you are occupying.

H

: Check this if the point has good horizontal coordinates

to use for horizontal control when localizing.

V

: Check this if the point has a good elevation to use for

vertical control when localizing.

Start Control Point Occupy : Opens the Occupy Control

Point screen, described on Page R-251.

Occupy Control Point

The Occupy Control Point screen is used to add geodetic coordinates

to an existing project point and is described on Page R-251.

Resection for New Base Point

Occupy Check > : opens the Collect Check Point Prompt

screen to select an existing job file point and initiate an

occupation to check the localization solved with the
minimum amount, and then create an extra GPS control

point, which will be used to re-solve the localization and
run the blunder detection routine.

Start Now > : starts surveying without checking the

localization. In this case, the localization solved with the
minimum control points will be set in the job file, and

the projection readjust mechanism will run to update

any job points as required. You must remember that the
solution has not been checked for quality.