beautypg.com

Figure 7-10. ts-lld tank gauge interface wiring, Page 7 - 22 tank sentinel, Installation guide – Franklin Fueling Systems Tank Sentinel (TS-1001, 2001, 504, 508 & 750) Installation User Manual

Page 65: Ts-lldi ( line leak detector interface ), Cu #2 cu #1 last cu #n cu #3

background image

7

Page

7 - 22

TANK SENTINEL

®

INSTALLATION GUIDE

PO

W

E

R

IN

P

U

T

S

I N 2

G N D

L1

d d

G N D

I N 1

F 1 4

B 1

+

+

J 1 4

TB2-3 DSY1

P O W E R

O N

S W 1

O F F

TS

-

L

LD

S . R T N

D S Y

4 8 5 B

4 8 5 A

J 1 3

W A R N I N G: AVOID ELECTRICAL SHOCK HAZARDS.
EXTERNAL POWER SOUCES MAY BE PRESENT -
LOCATE AND DISCONNECT ALL EXTERNAL POWER
SOURCES BEFORE WIRING OR SERVICING
THESE CIRCUITS.

TS-LLDI ( Line Leak Detector Interface )

485B
COMM LINE

DSY
CONTROL UNIT I.D. LINE

S. RTN
RS-485 COMMUNICATIONS
SIGNAL RETURN

TANK / LINE #1
TS-LLD CU #1:

TS-1001 CONSOLE
TS-LLD INTERFACE
TERMINALS AT J13:

t

485A
COMM LINE

TANK / LINE #3
TS-LLD CU #3:

TANK / LINE #2
TS-LLD CU #2:

LAST TANK / LINE #N

TS-LLD CU #N:

TB2-4 DSY2

TB2-3 DSY1

TB2-2 485B

TB2-1 485A

t

TB1-SIG RTN

TB2-3 DSY1

TB1-SIG RTN

TB1-SIG RTN

TB2-4 DSY2

TB2-4 DSY2

TB2-2 485B

TB2-2 485B

TB2-1 485A

TB2-1 485A

t

TB2-3 DSY1

TB1-SIG RTN

TB2-4 DSY2

JUMPER
NEEDED
AT LAST
UNIT
ONLY

t

TB2-2 485B

TB2-1 485A

CU #2

CU #1

last CU #N

CU #3

4 P-IN

SIG RTN

TB1

UP

1 485A
2 485B
3 DSY1
4 DSY2
5 ALARM

F1

TB2

GND

RE

L

A

Y

O

U

T

P

U

T

S

N O 2

TS-LLD Control Unit (CU) box

Enlarged View

TS-LLD Control Unit (CU)

Interface Terminals:

F 1 6

F 1 7

F 1 5

SAF

E

T

Y

GN

D

J 1 6

J 1 5

C 2

N C 2

N O 1

C 1

N C 1

J 1 7

GN

D

L2

NOTE --- DO NOT
RUN COMMUNICATIONS
CABLE WITH LINE
VOLTAGE WIRES.

4 P-IN

COMMUNICATIONS CABLE: (4) 22 - 28 AWG (0.6 - 0.5 mm)

SIG RTN

THIS SHIELD MUST BE
IN PLACE BEFORE THE
COVER IS RE-INSTALLED.

GREEN CONNECTOR (J1)

TB1

3 P-OUT

2 NEU

1 110V

1 485A
2 485B
3 DSY1
4 DSY2
5 ALARM

F1

TB2

TS

-

LLD

4 8 5 B

TB1-SIG RTN

TS-LLD CU cover (back view)

TB2-2 (485B)

TB2-3 (DSY 1)

S . R T N

D S Y

TB2-1 (485A)

Enlarged View of
Terminal Strip # J13

4 8 5 A

NOTE:

1)

CAUTION BEFORE attempting this

installation: Read and reference the TS-LLD Manual
about Safety, and CU Installation (and wiring steps).

2)

WARNING

Avoid electrical shock hazards —

Turn off and disconnect all power to the pumps and
dispensers before wiring at the TS-LLD Control Units.

3)

Eight TS-LLD Control Units can be interfaced to

the TS-2001 console, and Four can be interfaced to the
TS-1001 console

Figure 7-10.

TS-LLD Tank Gauge Interface Wiring