Franklin Fueling Systems Tank Sentinel (TS-1001, 2001, 504, 508 & 750) Operators Guide Rev. C User Manual
Automatic tank gauge / leak detection system, Operator’s guide
Table of contents
Document Outline
- TSOG Preface.pdf
- Table of Contents
- P Preface P -
- Graphic Symbol Conventions P -
- Page Numbering Convention - Example: P -
- Page Layout Convention - Example: P -
- Product Overview P -
- Figure P - 1 TS-1001 & TS-2001 Model ATG Consoles P -
- Alarms and Warnings - P -
- Tank Sentinel® Features P -
- Safety P -
- Approvals P -
- Need Help ? - Names and Phone Numbers to Contact P -
- Table of Contents
- TSOG chp1.pdf
- Contents
- 1 Console - Basic Operation 1 -
- General 1 -
- Operating Modes 1 -
- Figure 1 - 1. Console Component Identification 1 -
- Console Component Location 1 -
- Display 1 -
- Run Mode Display 1 -
- Sentinel Mode Display 1 -
- Tank or Line Testing Display 1 -
- Tank & Line Display Notes: 1 -
- Product & Tank Related Keys 1 -
- Menu Related Keys 1 -
- Changing the Display and Report Language 1 -
- Special Keys 1 -
- Selecting A Report 1 -
- Report Features 1 -
- Check Date &Time 1 -
- Check Display, Printer, or Dialtone 1 -
- Check Software & Hardware Options 1 -
- Starting a tank or Line Leak Test: 1 -
- Testing Note: 1 -
- Showing the Status of Tank or Line Leak Tests 1 -
- Indications of Active Tests: 1 -
- Aborting a Tank or Line Leak Test 1 -
- ACK Shift key uses: 1 -
- Upgrade Menu 1 -
- Sample Upgrade Instructions 1 -
- Contents
- TSOG chp3.pdf
- Contents
- Reports Overview 3 -
- Report Types (to PRINT / FAX) 3 -
- How to Print a Report (steps): 3 -
- FAXing a Report 3 -
- Where are Fax'd Reports Sent ? 3 -
- REPORT 3 -
- Example - Automatic Alarm Reports 3 -
- Typical Information Shown On Reports 3 -
- Product Inventory Detail Report 3 -
- Product Inventory Summary REPORT 3 -
- Tank Inventory Detail REPORT 3 -
- Tank Inventory Summary Report 3 -
- Product Delivery Detail Report 3 -
- Product Delivery Summary Report 3 -
- Product Delivery History Report 3 -
- Product Usage Detail Report 3 -
- Product Usage Summary Report 3 -
- Product Usage Reconcile REPORT ( Inventory Reconciliation Report ) 3 -
- Tank Leak Test Estimate Report 3 -
- Standard (Static) Tank Leak Test Report 3 -
- Slope & Leak Test Results 3 -
- SCALD Leak Test Report 3 -
- See Chapter 4 & 5 about Leak Testing and Leak Alarms. 3 -
- NOTE 3 -
- Line Compliance Test Report 3 -
- Line Leak Test Report 3 -
- Line Leak Diagnostic Report 3 -
- NOTE 3 -
- Line Leak Test History Report 3 -
- Report(s) Sent to Remote Fax Machines: 3 -
- Sensor Status Report 3 -
- Vapor Sensor Report 3 -
- See Chapter 2 & 5 about Sensors and Sensor Alarms. 3 -
- NOTE 3 -
- Alarm Reports 3 -
- Cleared System Alarms REPORT 3 -
- System Alarm History REPORT 3 -
- Active Tank Alarms REPORT 3 -
- Cleared Tank Alarms REPORT 3 -
- Tank Alarm History REPORT 3 -
- Cleared Sensor Alarms REPORT 3 -
- Sensor Alarm History REPORT 3 -
- Active Line Alarms REPORT 3 -
- Cleared Line Alarms REPORT 3 -
- Line Alarm History REPORT 3 -
- All Active Alarms REPORT 3 -
- All Cleared Alarms REPORT 3 -
- All Alarm History REPORT 3 -
- Changing the Number of Alarms to Print (in the Alarm History Report) 3 -
- System Setup Report 3 -
- Tank Setup Report 3 -
- Setup Report (example) 3 -
- Regulatory Report 3 -
- Generator Run Report 3 -
- Print Test Report 3 -
- Contents
- TSOG chp4.pdf
- Contents
- 4 Leak Testing 4 -
- Overview 4 -
- Tank Leak Tests - Type and Frequency 4 -
- Requirements 4 -
- Before Starting a Standard (static) Tank Leak Test 4 -
- When to Run Tank Leak Tests 4 -
- NOTE 4 -
- NOTE 4 -
- Starting Tank Leak Tests: 4 -
- Tank Leak Test Results 4 -
- Reasons Why Tank Leak Tests Fail: 4 -
- When a Leak Test Fails 4 -
- NOTE 4 -
- TS-LLD Line Leak Tests: 4 -
- Type and Frequency 4 -
- Requirements 4 -
- Before Starting a Line Leak Test: 4 -
- When to Run Line Leak Tests 4 -
- NOTE 4 -
- Starting Line Leak Tests 4 -
- When a Line Leak Test Fails / Line Leak is Detected 4 -
- NOTE 4 -
- Steps to take When a Line Leak is Detected: 4 -
- Need help ? 4 -
- Contents
- TSOG chp5.pdf
- Contents
- 5 TroubleShooting & Routine Maintenance 5 -
- TroubleShooting 5 -
- Table 5 - 1 Alarms & Error messages 5 -
- Table 5 - 1 (Continued... ) Alarms & Error messages 5 -
- Table 5 - 2 SYSTEM TEST SCHEDULE 5 -
- Site Policy: 5 -
- • Silencing Alarms 5 -
- • Acknowledging Alarms 5 -
- • Grace Periods (Allowed when, number of times, etc.) 5 -
- • Troubleshooting Alarms & Error Messages 5 -
- • Line and Tank Leak Test Failures 5 -
- • Call Numbers for Help 5 -
- TABLE 5 - 3 Fax Numbers & Location (Fill-in) 5 -
- Site Sketch / paste-in area: 5 -
- Routine Maintenance 5 -
- • External Cleaning 5 -
- • Replacing the Printer Paper Roll 5 -
- • Lubricate Printer: 5 -
- • Replacing Fuses, Memory-backup Battery, & Interior Cleaning: 5 -
- Contents
- TSOG FCCinfo.pdf