beautypg.com

3 ping test – ZyXEL Communications Version 1.03 User Manual

Page 103

background image

Chapter 9 Fault

NetAtlas Workgroup User’s Guide

103

2 Choose a switch from the list located on the left-hand side of the screen.
3 Choose a port from the list located on the right-hand side of the screen.
4 In the Timeout field, accept the default or specify a connection timeout period (in

seconds).

5 Click Apply to start the loopback test.

Figure 62 Fault: Loopback Test

6 A screen displays showing the test result. Click OK to close the screen.

Figure 63 fault: Loopback: Result

9.3 Ping Test

You can use the Ping screen to test connection from the selected switch to a specified IP
address.
Click Fault > Ping and TraceRoute Test and click the Ping tab to display the screen.