beautypg.com

6 commissioning the system – Adept s650H Quattro User Manual

Page 73

background image

Commissioning the System

Adept Quattro s650 Robot User’s Guide, Rev B

73

5.6

Commissioning the System

Turning on the robot system for the first time is known as “commissioning the system.”
You must follow the steps in this section to safely bring up your robot system. The steps
include:

• Verifying installation, to confirm that all tasks have been performed correctly.

• Starting up the system by turning on power for the first time.

• Verifying all E-Stops in the system function correctly.

• Moving the robot with the T1 (if purchased) to confirm each arm moves correctly.

Table 5-8. XIO Breakout Cable Wire Chart

Pin No.

Signal
Designation

Wire Color

Pin Locations

1

GND

White

26-pin male
connector on XIO
Breakout Cable

2

24 VDC

White/Black

3

Common 1

Red

4

Input 1.1

Red/Black

5

Input 2.1

Yellow

6

Input 3.1

Yellow/Black

7

Input 4.1

Green

8

Input 5.1

Green/Black

9

Input 6.1

Blue

10

GND

Blue/White

11

24 VDC

Brown

12

Common 2

Brown/White

13

Input 1.2

Orange

14

Input 2.2

Orange/Black

15

Input 3.2

Gray

16

Input 4.2

Gray/Black

17

Input 5.2

Violet

18

Input 6.2

Violet/White

19

Output 1

Pink

20

Output 2

Pink/Black

21

Output 3

Light Blue

22

Output 4

Light Blue/Black

23

Output 5

Light Green

24

Output 6

Light Green/Black

25

Output 7

White/Red

26

Output 8

White/Blue

Shell

Shield

Pin 9

Pin 1

Pin 18

Pin 10

Pin 19

Pin 26