beautypg.com

2 cable parts list, 3 installing the smartcontroller – Adept s650H Quattro User Manual

Page 52

background image

Chapter 4 - System Installation

52

Adept Quattro s650 Robot User’s Guide, Rev B

4.2

Cable Parts List

4.3

Installing the SmartController

Refer to the

Adept SmartController User’s Guide

for complete information on installing the

Adept SmartController. This list summarizes the main steps.

1. Mount the SmartController and Front Panel.

2. Connect the Front Panel to the SmartController.

3. Connect the T1 (if purchased) to the SmartController.

4. Connect user-supplied 24 VDC power to the controller.

5. Install a user-supplied ground wire between the SmartController and ground.

6. Install the AdeptWindows PC user interface. Refer to the

AdeptWindows

Installation Guide

.

Table 4-1. Cable Parts List

Part Description

Part Number

Notes

IEEE 1394 Cable, 4.5 M

10410-10545

Standard cable -
supplied with system

XSYS Cable, 4.5 M

02928-000

Standard cable -
supplied with system

Front Panel Cable

10356-10500

Supplied with Front
Panel

T1 Pendant Adapter Cable

05002-000

Supplied with
optional T1 pendant

Power Cable Kit - contains 24 VDC
and AC power cables

04972-000

Available as option

XIO Breakout Cable, 12 inputs/
8 outputs, 5 meter

04465-000

Available as option -
see

page 72

.