beautypg.com

3 getting started, Compact toolbox/toolbox ce installation, Inserting and removing test modules – EXFO FTB-8100 Series Transport Blazer for FTB-200 User Manual

Page 23: Turning the unit on, 3getting started, Aution, Arning

background image

SONET/SDH Application

11

3

Getting Started

If the FTB-8100 Series Transport Blazer has been purchased at the same
time as the FTB-200, the FTB-8100 Series module is pre-installed with the
appropriate Compact ToolBox/ToolBox CE software version.

Compact ToolBox/ToolBox CE Installation

Compact ToolBox or ToolBox CE is the baseline software and thus needs to
be installed on the FTB-200 before using the FTB-8100 Series module.

Note: Refer to the FTB-200 platform user guide for more information on Compact

ToolBox/ToolBox CE installation procedure.

Inserting and Removing Test Modules

Note: Refer to the FTB-200 platform user guide for more information on how to

insert a module into the FTB-200 or to remove a module from the FTB-200.

Turning the Unit On

Turn on the FTB-200. Refer to the FTB-200 platform user guide for more
information.

C

AUTION

Never insert or remove a module while the FTB-200 is turned on.
This will result in immediate and irreparable damage to both the
module and unit.

W

ARNING

When the laser safety LED is flashing on the SONET/SDH Application,
at least one of your modules is emitting an optical signal. Please
check all modules, as it might not be the one you are currently
using.