Chapter 9, Maintenance, Before you begin – Rockwell Automation CHPS-250 Linear Stage Installation User Manual
Page 59: Chapter

Rockwell Automation Publication CHPS-UM001D-EN-P - July 2014
59
Chapter
9
Maintenance
Before You Begin
The following tools are required to lubricate and clean your stage.
• 0.5 m (14 in.) or larger clamp with soft jaws.
• Grease (catalog number MPAS-CART).
• Grease gun kit (catalog number MPAS-GPUMP) with tip type installed
and primed.
• Air line with maximum pressure of 10 psi.
• Lint free cloth.
• A few drops of isopropyl alcohol if necessary for cleaning encoder scale.
Topic Page
Optical Encoder Scale Maintenance
IMPORTANT
Any person that teaches, operates, maintains, or repairs these stages must be
trained and demonstrate the competence to safely perform the assigned task.
ATTENTION: Lockout tagout power before servicing.
This manual is related to the following products: