Commissioning
3.4
Commissioning with the »Engineer«
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3.4.2
Creating an »Engineer« project & going online
The following steps describe the standard procedure of creating a project using the Select
component from catalogue option. Here, you select the single components (controller, motor, etc.)
from selection lists.
1. Start the »Engineer«.
2. Create a new project by means of the Start-up wizard and the Select component from catalogue
option:
• In the Component dialog step, select the 8400 BaseLine D controller.
• Select the other components (motor/gearbox) to be added to the project in the Other
components dialog step.
3.
Go online.
• After a successful connection to the controller, the following status is displayed in the Status
line:
4.
Download parameter set.
• This command serves to overwrite the current parameter settings in the controller by para-
meter settings of the »Engineer« project.
You can find detailed information on the general use of the »Engineer« in the online help
which you can call with [F1].
• In the "Working with projects" chapter, all options of the start-up wizard are described
to create a new »Engineer« project.