beautypg.com

Festo Контроллер крайних положений SPC11 User Manual

Page 98

background image

4. Commissioning

4-40

Festo P.BE-SPC11-SYS-EN en 1406e

4.4.1 Switch-on behaviour after successful commissioning

If commissioning has already been carried out, the SPC11 is
ready to operate after a few seconds.

Start: Switch-on reaction

Position
P.01 or P.02?

SPC11 is ready to operate.
The axis is pressed actively
into the end position and
waits for the positioning task.

The axis stands uncontrolled
and waits for:
– Positioning order

(SPC11 is ready to operate)

– Reference travel

(only for type SPC11-INC)

Yes

No

Wait approx. 1 second

Firmware
version number

Display of the firmware
version

Wait approx. 0.5 seconds

Display of the:

- Amplification stage (A)
- Cushioning stage (C)
- System parameters (S)

Current value

Set (for SPC11-INC):

- Nominal stroke length (L)
- Offset axes zero point (r)

Wait approx. 1 second

Wait approx. 1 second

Wait approx. 1 second

Display of the o-parameter

Current value

Wait approx. 1 second

Wait approx. 1 second

Only for use of
incremental path
measuring systems

Not with use of
incremental path
measuring systems
(type SPC-INC

)

Current value

Current value

Fig. 4/7: Switch-on reaction of the SPC11 after commissioning