Festo Контроллер крайних положений SPC11 User Manual
Page 98
4. Commissioning
4-40
Festo P.BE-SPC11-SYS-EN en 1406e
4.4.1 Switch-on behaviour after successful commissioning
If commissioning has already been carried out, the SPC11 is
ready to operate after a few seconds.
Start: Switch-on reaction
Position
P.01 or P.02?
SPC11 is ready to operate.
The axis is pressed actively
into the end position and
waits for the positioning task.
The axis stands uncontrolled
and waits for:
– Positioning order
(SPC11 is ready to operate)
– Reference travel
(only for type SPC11-INC)
Yes
No
Wait approx. 1 second
Firmware
version number
Display of the firmware
version
Wait approx. 0.5 seconds
Display of the:
- Amplification stage (A)
- Cushioning stage (C)
- System parameters (S)
Current value
Set (for SPC11-INC):
- Nominal stroke length (L)
- Offset axes zero point (r)
Wait approx. 1 second
Wait approx. 1 second
Wait approx. 1 second
Display of the o-parameter
Current value
Wait approx. 1 second
Wait approx. 1 second
Only for use of
incremental path
measuring systems
Not with use of
incremental path
measuring systems
(type SPC-INC
)
Current value
Current value
Fig. 4/7: Switch-on reaction of the SPC11 after commissioning