4. Commissioning

4-33

Festo P.BE-SPC11-SYS-EN en 1406e

Overview of the commissioning sequence on the
SPC11

Set the parameters and start the automatic teach procedure
(SPC11 in status at delivery)

Switch on

Set (only for SPC11-INC):

- Nominal stroke length (L)
- Offset axes zero point (r)

Setting:

- Amplification stage (A)
- Cushioning stage (C)
- System parameters (S)

Set respective
value with +/-.
Conclude each
entry with Enter.

The SPC11 waits for
the teach task

Pre-commissioning
is concluded.
Teach task can be
started.

Teach procedure is
carried out

The teach task is concluded successfully

Mass is pressed against
the end position;
O1 supplies a 1-signal

P.03 and P.04 can be
taught (see next page).

The t flashes

The dots flash

Enter button

Teach button/input

Firmware version number

Display of
firmware version

Wait approx. 0.5 second

Setting (optional)

- o-parameter

Fig. 4/5: Setting the param. and starting the teach procedure