Festo Контроллер крайних положений SPC11 User Manual
Page 77
4. Commissioning
4-19
Festo P.BE-SPC11-SYS-EN en 1406e
When all prerequisites for carrying out the teach procedure
have been made (see sections 4.3.1), the teach procedure
can be started (see sections 4.3.2).
16. If you wish to conclude pre-commissioning, switch off the
operating voltage.
Switch-on behaviour after successful
pre-commissioning (in the office)
When the operating voltage is switched on again, the SPC11
shows briefly the firmware version number and then one after
the other the values of the set parameters. The SPC11 then
indicates readiness to carry out the teach procedure (t..). The
t flashes (see Fig. 4/4).