3 display and connecting elements of the spc11 – Festo Контроллер крайних положений SPC11 User Manual
Page 23
1. Summary of components
1-9
Festo P.BE-SPC11-SYS-EN en 1406e
1.3
Display and connecting elements of the SPC11
The diagram below shows the display and connecting
elements of the SPC11.
1
2
3
4
5
6
7
8
1
Control: operating voltage connection
and I/O coupling
2
Valve: valve connection
3
Display
4
Operating buttons
5
Type plate see side
6
Groove for identification signs
(type IBS 6x10)
7
Measuring system connection
(here type SPC11-POT-TLF)
8
Earth (ground) connection
Fig. 1/3: Display and connecting elements of the SPC11
With the SPC11-POT-... and SPC11-MTS-..., the connecting
cable for the measuring system is firmly connected to the
SPC11. With the SPC11-INC or the SPC11-MTS-AIF-2, the
measuring system connection is in the form of a socket.