Section ii, Installation, Section ii: installation – Allied Telesis AT-MCF2300 User Manual
Page 85

Section II: Installation
85
Section II
Installation
This section presents the installation instructions in the following chapters:
Chapter 6, “Reviewing the Safety Precautions” on page 87
Chapter 7, “Selecting a Location” on page 91
Chapter 8, “Unpacking the AT-MCF2000 or AT-MCF2300 Chassis” on
page 93
Chapter 9, “Removing the Rubber Feet” on page 97
Chapter 10, “Installing the AT-MCF2000AC or AT-MCF2300AC Power
Supply Module” on page 99
Chapter 11, “Installing the AT-MCF2KFAN Module” on page 103
Chapter 12, “Installing a Media Converter Module” on page 107
Chapter 13, “Installing the AT-MCF2000M Management Module” on
page 111
Chapter 14, ”Installing the AT-MCF2000S Stacking Module” on page
115
Chapter 15, “Installing the Chassis in an Equipment Rack” on page
119
Chapter 16, “Grounding the AT-MCF2300 Chassis” on page 123
Chapter 17, “Installing the SFP Modules in the AT-MCF2032SP
Module” on page 125
Chapter 18, “Cabling the Ports on the Media Converter Module” on
page 129
Chapter 19, “Cabling the AT-MCF2000M and AT-MCF2000S Modules”
on page 131
Chapter 20, “Powering on the Chassis” on page 135
Chapter 21, “Verifying the Installation” on page 139
Chapter 22, “Starting a Local Management Session” on page 143
Chapter 23, “Troubleshooting the Modules” on page 145