beautypg.com

Series operation, Ge 83, Operation – GW Instek PSU-Series User Manual User Manual

Page 83

background image

OPERATION

83

Note

Ensure load cables have sufficient
current capacity.

Page 39

Series Operation

Series
Configuration

Before using the power supplies in series, the
master and slave units need to be configured.

1. Configure the OVP, OCP and ULV

settings for each unit.

Page 51

2. For each unit, hold the Function key while

turning the power on to enter the power on
configuration settings.

Lock/Local

PROT

Function

Test

Set

Output

Unlock

ALM_CLR

M 1

M 2

M 3

Shift

: Long Push

VSR

LAN

RMT

ERR

DLY

ALM

ISR

M 1

M 2

M 3

RUN

C C

A

C V

V

VOLTAGE

CURRENT

PSU 40-38

DC Power Supply

0 - 40V / 0 - 38A

Voltage

Current

3. Make sure each unit is set to

Independent (F-93 = 0). When
using the power supplies in series,
each unit is operated individually,
and thus no unit is considered the
master or slave.

Page 111

Unit

F-93

Independent

0

4. Cycle the power on the units (reset the power).

Note

Configuration settings can be checked for both the
master and slave units by pressing the Function
key.