beautypg.com

Master-slave parallel operation, Operation – GW Instek PSU-Series User Manual User Manual

Page 75

background image

OPERATION

75

Master-Slave Parallel Operation

Master-Slave
Configuration

Before using the power supplies in parallel, the
master and slave units need to be configured.

Steps

1. Configure the OVP, OCP and ULV

settings for the master unit.

Page 51

2. For each unit, hold the Function key while

turning the power on to enter the power on
configuration settings.

Lock/Local

PROT

Function

Test

Set

Output

Unlock

ALM_CLR

M 1

M 2

M 3

Shift

: Long Push

VSR

LAN

RMT

ERR

DLY

ALM

ISR

M 1

M 2

M 3

RUN

C C

A

C V

V

VOLTAGE

CURRENT

PSU 40-38

DC Power Supply

0 - 40V / 0 - 38A

Voltage

Current

3. Configure F-93 (Master/Slave)

setting for each master/slave unit.

Page 111

Unit

F-93

Independent (default setting)

0

Master unit with 1 slave in parallel

1

Master unit with 2 slaves in parallel

2

Master unit with 3 slaves in parallel

3

Slave (parallel)

4

4. Cycle the power on the units (reset the power).