beautypg.com

Operation, Black/brown  line (l), White/blue  neutral (n) – GW Instek PSU-Series User Manual User Manual

Page 37: Green /green & yellow  ground ( )

background image

OPERATION

37

3

2

2-M3x6L
Pan Head Screw

GND: Green or
Green and Yellow

N: White or Blue

L: Black or Brown

4

Installation

1. Connect the AC power

cord wires to the AC input
terminals.

Black/Brown  Line
(L)

White/Blue  Neutral
(N)

Green /Green & Yellow

Ground (

)

AC INPUT

2000VA MAX.

47 63Hz

100 240V

AC

N

L

G

ro

un

d

Li

ne

N

eu

tra

l

2. Make sure the sheath is

tightened to the lock nut.

3. Re-install the power cord

cover.

Screw on
locknut