beautypg.com

GW Instek PSU-Series User Manual User Manual

Page 74

background image

PSU Series User Manual

74

Example with
negative terminal
connected to
ground

Slave #1

Master

Load
Input

Input

Output

Ground

Output

Output

Ground

Output

Slave #2

Output

Ground

Output

Steps

1. Ensure the power is off on all power supplies.

2. Choose a master and a slave unit(s).

3. Connect the analog connectors for the master

and slave units as shown above.

4. Remove the Output Terminal

covers.

Page 43

5. Connect the master and slave unit in parallel as

shown above.

6. Reattach the terminal covers.

Page 43

Note

Ensure the load cables have sufficient
current capacity.

Page 39

The load wires and remote sense wires should use
twisted-paired wiring of the shortest possible
length.