Occupy control setup, Occupy control point – Spectra Precision Survey Pro v4.6 Recon-Nomad Reference Manual User Manual
Page 264
Survey Pro Reference Manual
R-256
Occupy Control Setup
The Occupy Control Setup screen is used to specify
which job point with accurate NEE coordinates you are
occupying and if you want to use the point for horizontal
and/or vertical control when localizing (this can be
changed later).
Point
: is the existing job point you are occupying.
H
: Check this if the point has good horizontal coordinates
to use for horizontal control when localizing.
V
: Check this if the point has a good elevation to use for
vertical control when localizing.
Start Control Point Occupy : Opens the Occupy Control
Point screen, described on Page R-261.
Occupy Control Point
The Occupy Control Point screen is used to add geodetic coordinates
to an existing project point and is described on Page R-261.
Resection for New Base Point
Occupy Check > : opens the Collect Check Point Prompt
screen to select an existing job file point and initiate an
occupation to check the localization solved with the
minimum amount, and then create an extra GPS control
point, which will be used to re-solve the localization and
run the blunder detection routine.
Start Now > : starts surveying without checking the
localization. In this case, the localization solved with the
minimum control points will be set in the job file, and
the projection readjust mechanism will run to update
any job points as required. You must remember that the
solution has not been checked for quality.