Chapter 5: Maintenance

5.1 Field-replaceable Parts

WARNING: Only qualified service personnel may install
or service the robot system.

The following parts are the only field-replaceable parts:

Table 5-1. Field-replaceable Parts

Part

Adept Part Number

Encoder battery pack

09977-000 (3.6 V, 6.8 Ah)
(This has replaced part number 02704-000)

AIB (Amp-In-Base)

04900-000

eAIB (Amp-In-Base)

19800-800

These parts must only be replaced with the Adept part numbers identified in the preceding
table.

5.2 Periodic Maintenance Schedule

The following table gives a summary of the preventive maintenance procedures and
guidelines on frequency.

Table 5-2. Inspection and Maintenance

Item

Period

Reference

Check E-Stop, enable, key switches, and barrier interlocks 6 months

See Section 5.3

Check robot mounting bolts

6 months

See Section 5.4

Check for signs of oil around the harmonic drives

3 months

See Section 5.5

Lubricate Joint 3 (Z-axis) ball screw

3 months

See Section 5.6

Replace Encoder battery

5 to 10
years

See Section 5.9

NOTE: The frequency of these procedures will depend on the particular system, its
operating environment, and amount of usage. The periods shown are