Spectra Precision Survey Pro v4.6 Recon and Nomad User Manual User Manual
Page 87
Conventional Fieldwork
77
f. The Stake Points screen will show the necessary
FORWARD / BACK and Go RIGHT / Go LEFT
information that the rod man must move in order
to be located over the design point. In this
example, the Go RIGHT value indicates 0, which
means the rod is precisely on the line between
the total station and the design point. The BACK
value indicates 0.711, which indicates that the
rod must move back (away from the total station)
0.711 feet to be over the design point. The Fill
value is zero so no dirt needs to be cut or filled at
the rod location to match the design elevation.
g. Assuming the rod has been repositioned, take
another shot by tapping the Shot
.
button and
enter the following new shot data:
Angle Right: 45
Zenith Angle: 90
Slope Dist: 70.8 and then tap to continue.
h. The rod must now move FORWARD by 0.089 feet
to be over the design point. We will assume that
this is close enough and will store the point from
this shot by tapping the Store… button.
i. Enter the following point information:
Point: 5
Description: Staked and tap . This will return
you to the first Point Stake screen.