beautypg.com

Collect control – screen 1, Collect control – screen 2 – Spectra Precision Survey Pro v4.6 Recon and Nomad User Manual User Manual

Page 356

background image

User’s Manual – GPS Mode

346

Collect Control – Screen 1

1. Select an existing job file point
2. Designate if it is valid for horizontal, vertical, or

3D control.

3. Level the receiver over the point and tap

Start Control Point Occupation. This will open the

next Collect Control screen (Page 346) to monitor

the occupation.



Collect Control – Screen 2

1. Review the choice of H/V control eligibility.

2. Tap Accept to end the occupation. The control

point is created in the job file and the raw data is

recorded. This screen and the previous screen

will exit, and you will be at one of two places:

a. If you do not yet have the minimum

amount of control, you will remain on the

Projection Control Point Status screen
(Page 344).

b. If you now have the minimum amount of

control, you will move forward to the
Projection Check Point Status screen

(Page 347).