Collect check point prompt, Collect check point screen – Spectra Precision Survey Pro v4.6 Recon and Nomad User Manual User Manual
Page 358
User’s Manual – GPS Mode
348
Collect Check Point Prompt
1. Select an existing job file point.
2. Designate if it is valid for horizontal, vertical, or
3D control.
3. Level the receiver over the point and tap Start
Control Point Occupation. This will open the
Collect Check Point screen, below, to monitor the
occupation.
Collect Check Point Screen
1. Examine the errors. Only the errors for the dimensions you
specify for this control point (2D/1D/3D) will be shown.
2. Tap Accept to finish the occupation. The control
point is created in the job file and the raw data is
recorded. This screen and the previous screen
will exit, and you will be at one of two places:
a. If you do not have one extra H or V point
for the localization check, you will be
back at the Check Points Status screen
(Page 347).
b. If you have the required H and V points
for the check, the wizard will advance to
the Solve Localization and Detect
Blunders screen, below.