E-Mon Energy Software User Manual
Page 124

Rate Table and TOU Schedule
E-Mon Energy User Manual
12-5
E-MON
6
Under Season, select Type 1, Season 1 Tab.
7
Type in or select from Calendar, a Start Date and End Date for Type1, Season 1 schedule
Figure 12.6 - Schedule Setup Group
8
In the From\Mon cell, type in the starting time for Monday.
Note: The schedule uses military time.
(e.g. 13:00 = 1:00 PM)
9
In the To\Mon cell, type in the time the schedule will stop on Monday.
10 Repeat the same steps for each day of the week, up to the last day for the schedule.
11 If you want to run this schedule on the weekdays, click Weekdays use the same schedule.
Figure 12.7 - TOU Schedule View
12 Repeat the Steps 6 to 12 again for each Type and Season tabs that applies to the TOU type
and Seasons entered.
13 Click on “√ ” button to accept/save the TOU schedule record. The Time/Day of the Week
graph displays the day and time frame related to the Type and Season schedule.
Season Tabs
Type Tabs
(Periods)
Click in cell area
to enter the Time.
Type or select from
popup Calendar the Start
and End Date for the
schedule