beautypg.com

H - mechanical inspection, 107 chapter 7 troubleshooting – Hardy HI 3010 Filler/Dispenser Controller User Manual

Page 123

background image

107

CHAPTER 7
Troubleshooting

H - Mechanical Inspection

H

1) Keep flexures on the horizontal
2) Vertical flexures should be avoided
3) Do not use flexures to correct for misaligning piping
4) Do not use hose flexures to make right angle bends
5) Non-flexed piping should have an unsupported

horizontal run using a ratio of 36 times its diameter.

6) Pipe flexure lengths should be a ratio of 6 times it’s diameter
7) Feed and discharge piping flexed
8) Are the flex joints on the correct side of the valve?
(a) You weigh the output valve, not the input valve
(b) Does the weigh scale see all the product to be weighed?

(C) If the product applies a force to a valve or pipe so that

pipe or valve must be included in the weigh vessel.
(d) Proper positioning of the flexures are key.
(E) Your vessel must seem to float.

H1

1) Floors or structures do not interact.
2) Local traffic does not interact.
3) Protected from forklifts and adjacent processing equipment

1) Level, solid mounting base
2) The load cell is mounted right side up.
3) All load cell bolts installed using anti-seize compounds.
4) Mechanically aligned to compensate for expansion and contraction.

1) Protects the load cells from overload and impact forces
2) Limits the movement of the vessel.
3) Rods must be loose and not interacting with the vessel.

1) Separate conduit for low and high voltage cables.
2) Do not bundle low voltage with high voltage cables.
3) Maintain at least 3 inches of separation.
4) Maintain 14” separation from magnetic fields and 440 VAC.
5) Cables are in conduit or tied up and protected from damage.

1) Product, tools and production aids are off the vessel.
2) No workers are physically on the scale.
3) Must protect equipment from environmental damage
4) Make sure openings are sealed to keep water and environmental
contaminates from damaging:
(a) Instrument Cabinet or Enclosure
(b) Summing Card
(c) Load Cells
(d) Conduit Runs
(e) Covers are properly installed

H6

All pipes and conduits

flexible?

H2

Mechanically Isolated

from ladders and

connecting structures?

H3

Are the load cells

properly mounted?

H4

Are Check Rods

installed to dampen

vessel movement?

H5

Are cables routed

properly?

Housekeeping

To

Verify Electrical

Go to

J