beautypg.com

IAI America CON-PG User Manual

Page 153

background image

147

6. Operation of SEP

Controllers

6.12 Test (I/O Tests, Operation Tests for Axis Movement)

You can perform I/O tests and operation tests for axis movement.

Touch [Initial Set] on the SEP menu screen.

Touch [Test].

Touch [Menu] to return to the SEP menu screen.

Select and touch either [I/O Test] or [TestPlay].

x I/O Test: PIO input signals can be monitored.

Also, the output signals can be forcibly turned ON or OFF by touching OUT0, OUT1,
OUT2 and OUT3.

6.13

This manual is related to the following products: