F.1 APOGEE FLN Set-Up
A Yaskawa America, Inc. representative is responsible for proper configuration of the Bypass for its primary application,
while a Siemens Building Technologies, Inc. representative is responsible for field panel programming to make use of the
Bypass functionality in the building automation system. As such, there must be coordination between the Yaskawa America
and Siemens Building Technologies representatives to ensure that the programming of the drive is consistent with the particular
application requirements. After verifying that the drive installation and wiring are correct, apply power to the drive.
lists the parameters and their values required for proper APOGEE FLN communication and control.
u
Bypass Parameter Settings for APOGEE FLN Communications
Table F.1 Drive Communication Parameter Settings
Parameter Number
Digital Operator Display
Settings for APOGEE FLN Communication
Z1-07
Reference Source
2: Serial Com
Z1–08
Run Source
2: Serial Com
Z3–02
Serial Comm Adr
Select the Bypass address
Z3–03
Serial Baud Rate
2: 4800 Baud
Z3–01
Protocol Select
2: P1
NOTICE: A Yaskawa representative should set the drive parameters to their appropriate values. Changes made to the parameters other
than what is listed in the table above can result in damaging the drive or building equipment.
F.1 APOGEE FLN Set-Up
340