7 installing and removing the blade, 1 installation, 1 installing the atca-7350 in a powered shelf – Artesyn ATCA-7350 Installation and Use (September 2014) User Manual
Page 51: Installing the atca-7350 in a powered shelf
![background image](https://www.manualsdir.com/files/772439/content/doc051.png)
Hardware Preparation and Installation
ATCA-7350 Installation and Use (6806800G59G)
51
2.7
Installing and Removing the Blade
2.7.1
Installation
RTM-ATCA-7x50 must be installed before the ATCA-7350 to avoid product damage. For more
information on RTM-ATCA-7x50, refer to RTM-ATCA-7150 Installation and Use manual and RTM-
ATCA-7350 Installation and Use manual.
2.7.1.1
Installing the ATCA-7350 in a Powered Shelf
The following procedure describes the installation of the blade. It assumes that your system is
powered. If your system is unpowered, you can disregard the blue LED and thus skip the
respective step. In this case it is a purely mechanical installation.
1. Wear the ESD-preventive wrist strap.
For details, see
Wearing the ESD-Preventive Wrist Strap
2. Take the ATCA-7350 out of the antistatic package.
3. Fully open the upper and lower ejector handles.
4. Slide the ATCA-7350 along the guide rails until the positioning pins of the ATCA-7350 are
inserted in the positioning holes in the shelf, as shown in
.
5. Make sure that the upper and lower ejector handles are attached to the beam properly.
Close the upper and lower ejector handles until the inner sides of the ejector handles are
attached to the face plate, as shown in
. After closing the handles, the blue LED,
OOS and IS LEDs blink. When payload is powered on, the blue LED is continuously
illuminated, and the OOS and IS LEDs are out.
6. User the screwdriver to clockwise fasten the screws to fix the ATCA-7350, as shown in
.