Table 2-1, List of packing items, Hardware preparation and installation – Artesyn ATCA-7350 Installation and Use (September 2014) User Manual
Page 28

Hardware Preparation and Installation
ATCA-7350 Installation and Use (6806800G59G)
28
3. Remove the desiccant bag shipped together with the blade and dispose of it
according to your country’s legislation.
Unpacking the Blade
To unpack and check the ATCA-7350 suite, proceed as follows:
1. Wear the ESD-preventive wrist strap.
For more details, see
Wearing the ESD-Preventive Wrist Strap
.
2. Lay the packing carton according to the arrow direction on the cover.
3. Cut the tape to open the packing carton.
4. According to
, check that the components are complete and in good condition,
without defects such as oxidation, chemical corrosion, missing component, or
transportation damage.
The blade is thoroughly inspected before shipment. If any damage occurred during
transportation or any items are missing, please contact our customer's service immediately.
Table 2-1 List of Packing Items
SN
Description
1
Packing materials, such as packing carton, plastic package, and foam
2
Documentation bag, containing documents shipped with the product
3
ATCA-7350, which can be used with an RTM-ATCA-7150 or RTM-ATCA-7350
But 10G Ethernet support is only available with RTM-ATCA-7350.
4
RTM-ATCA-7150 or RTM-ATCA-7350, which must be used with an ATCA-7350
5
Desiccant bag