DeviceMaster Installation and Configuration Guide: 2000594 Rev. A
Hardware Installation - 29
Hardware Installation
4.
Verify that the PWR LED has completed the boot cycle and network
connection for the DeviceMaster RTS is functioning properly using the table
below.
5.
Go to
on Page 35 for default network settings and how to
configure the DeviceMaster for use.
DeviceMaster RTS 16-Port (External Power Supply) LED Descriptions
Red
LED
Red LED on the front panel of the DeviceMaster is lit, indicating you
have power and it has completed the boot cycle.
Note: The LED flashes while booting and it takes approximately 15
seconds for the Bootloader to complete the cycle. When the
Bootloader completes the cycle, the LED has a solid, steady light
that blinks approximately every 10 seconds.
LNK
ACT
The red LNK ACT LED is lit, indicating that
you have a working Ethernet connection.
COL
If the red COL LED is lit, there is a network
collision.
100
If the red 100 LED is lit, it indicates a
working 100 MB Ethernet connection (100
MB network, only). If the LED is not lit, it
indicates a 10 MB Ethernet connection.
Note: For additional LED information, go to the
LNK
ACT
COL
100
10/100 NETWORK
UP
DOWN