Preparing the detectors, Uv lamps – Bio-Rad ChromLab™ Software User Manual
Page 99

Preparing the Detectors
Instrument Guide
| 97
4.
Connect the tubing to the check valves.
Preparing the Detectors
The NGC systems ship with the conductivity monitor and the UV detectors installed,
calibrated, and ready for use. These modules require no preparation.
The pH module (if installed) requires you to install and calibrate the pH probe. See
Replacing the pH Probe on page
for information about installing a
new pH probe.
UV Lamps
The UV detector ships with the UV lamps installed. When the instrument starts, the
lamps turn on.
This manual is related to the following products: