Plumbing the ngc discover pro system – Bio-Rad ChromLab™ Software User Manual
Page 285

Plumbing NGC Systems
Instrument Guide
| 283
Plumbing the NGC Discover Pro System
Table
23 lists the tasks for plumbing the NGC Discover Pro system. The tasks are
explained in detail in the sections that follow.
Note:
Ensure that you complete the plumbing tasks in the sections
Plumbing the NGC Discover System on
before continuing.
The figure on page
284 shows the Point-to-Plumb connections for the
NGC
Discover Pro system.
Table 23.
Plumbing tasks for the NGC Discovery Pro systems
Tasks
1.
Tube #6 between the outlet port on the sample inlet valve and the
inlet port on the sample pump
Note:
Remove the inlet tubing from the sample pump inlet
manifold if it is installed.
2.
Connect one of the following:
Tube #4 from the Common inlet port on the BioFrac fraction
collector diverter valve to port 1 on the outlet valve
Waste tubing to port 1 on the outlet valve
3.
Inlet tubing to the remaining ports on the sample inlet valve
See the section
Plumbing Sample Inlet Valves on page
.
4.
Outlet tubing to the remaining ports on the outlet valve
See the section