Plumbing NGC Systems
Instrument Guide
| 271
Plumbing the NGC Quest System
20 lists the tasks for plumbing the NGC Quest™ system. The tasks are
explained in detail in the sections that follow.
Note:
Ensure that you complete the plumbing tasks in the section
before continuing.
The figure on page
272 shows the Point-to-Plumb™ connections for the
NGC
Quest system.
Table 20.
Plumbing tasks for the NGC Quest system
Tasks
1.
Inlet tubing to the system pump A inlet manifold
2.
Inlet tubing to the system pump B inlet manifold
3.
Tube #4 from the 40 psi backpressure regulator to the Common inlet port
on the BioFrac™ fraction collector diverter valve