Plumbing the ngc scout system – Bio-Rad ChromLab™ Software User Manual
Page 276

C
| Plumbing the System
274
| NGC Chromatography Systems and ChromLab Software
Plumbing the NGC Scout System
21 lists the tasks for plumbing the NGC Scout™ system. The tasks are
explained in detail in the sections that follow.
Note:
Ensure that you complete the plumbing tasks in the section
before continuing.
The figure on page
275 shows the Point-to-Plumb connections for the
NGC
Scout
system.
Table 21.
Plumbing tasks for the NGC Scout system
Tasks
1.
Inlet tubing to ports Q1–Q4 on the buffer blending valve
2.
Waste tubing to the calibration outlet port (Cal Out) on the pH valve
3.
Pump head wash priming line
to the calibration inlet port (Cal In) on pH
valve
4.
Tube #2 from the 40 psi backpressure regulator to the inlet port on the
pH valve
5.
Tube #4 from the outlet port on the pH valve to the Common inlet port on
the BioFrac fraction collector diverter valve