beautypg.com

Plumbing all ngc systems, When you installed the system. see – Bio-Rad ChromLab™ Software User Manual

Page 267

background image

Plumbing NGC Systems

Instrument Guide

| 265

Plumbing All NGC Systems

Table

19 lists the tasks for plumbing all NGC systems. The tasks are explained in

detail in the sections that follow.

Plumbing the System Pumps Wash Lines

All configurations ship with the pump wash system preplumbed except for the inlet

and outlet tubing. Plumbing the inlet and outlet tubing is specific to the type of

pump (system pump configuration or sample pump). The following images display a

detailed view of the connectivity and flow direction of the rinse solution through the

tubing segments for the system pumps and the sample pump.

Table 19.

Plumbing tasks for all NGC systems

Task

1.

Inlet tubing to the pump head wash port on system pump A

2.

Pump head wash priming line

to the pump head wash port on

system pump B

3.

1/4-28 union to priming line on system pump B

4.

Pump head wash inlet to the 1/4-28 union attached to the pump head
wash priming line on system pump B

5.

On the sample inject valve:

Sample loop

Injection port

Waste lines (2)

6.

Tube #2 from the outlet on the conductivity flow cell to the inlet on the
40 psi backpressure regulator