beautypg.com

Rockwell Automation 1408-EMxx PowerMonitor 1000 Unit User Manual

Page 94

background image

94

Rockwell Automation Publication 1408-UM001D-EN-P - September 2013

Appendix A PowerMonitor 1000 Data Tables

Table 33 - Demand Results Parameters

CSP File No.

F24

CIP Instance

17

No. of Elements

9

No. of Words

18

Data Type

Float

Data Access

Read

Table 34 - Demand Results

Element

No.

Modbus

Address

Element Name

Range

TR1

TR2

EM1

EM2

EM3

Description

0

30501-2

kWatt Demand

+/- 0.000…9,999,999

The average real power during the last

demand period.

1

30503-4

kVAR Demand

+/- 0.000…9,999,999

The average reactive power during the

last demand period.

2

30505-6

kVA Demand

0.000…9,999,999

The average apparent power during the

last demand period.

3

30507-8

Demand PF

-100.0…+100.0

The average demand for PF during the

last demand period.

4

30509-10

Projected kWatt

Demand

+/- 0.000…9,999,999

The projected total real power for the

current period.

5

30511-12

Projected kVAR

Demand

+/- 0.000…9,999,999

The projected total reactive power for

the current period.

6

30513-14

Projected kVA

Demand

0.000…9,999,999

The projected total apparent power for

the current period.

7

30515-16

Elapsed Demand

Period Time

0.00…99.99

The amount of time that has elapsed

during the current period.

8

30517-18

Metering Iteration

0…9,999,999

Increments by 1 for each new metering

calculation.

This manual is related to the following products: