Rockwell Automation 1408-EMxx PowerMonitor 1000 Unit User Manual
Page 94

94
Rockwell Automation Publication 1408-UM001D-EN-P - September 2013
Appendix A PowerMonitor 1000 Data Tables
Table 33 - Demand Results Parameters
CSP File No.
F24
CIP Instance
17
No. of Elements
9
No. of Words
18
Data Type
Float
Data Access
Read
Table 34 - Demand Results
Element
No.
Modbus
Address
Element Name
Range
TR1
TR2
EM1
EM2
EM3
Description
0
30501-2
kWatt Demand
+/- 0.000…9,999,999
•
•
The average real power during the last
demand period.
1
30503-4
kVAR Demand
+/- 0.000…9,999,999
•
•
The average reactive power during the
last demand period.
2
30505-6
kVA Demand
0.000…9,999,999
•
•
The average apparent power during the
last demand period.
3
30507-8
Demand PF
-100.0…+100.0
•
•
The average demand for PF during the
last demand period.
4
30509-10
Projected kWatt
Demand
+/- 0.000…9,999,999
•
•
The projected total real power for the
current period.
5
30511-12
Projected kVAR
Demand
+/- 0.000…9,999,999
•
•
The projected total reactive power for
the current period.
6
30513-14
Projected kVA
Demand
0.000…9,999,999
•
•
The projected total apparent power for
the current period.
7
30515-16
Elapsed Demand
Period Time
0.00…99.99
•
•
The amount of time that has elapsed
during the current period.
8
30517-18
Metering Iteration
0…9,999,999
•
•
Increments by 1 for each new metering
calculation.