beautypg.com

1 windows® ce operating system, 12 visualisation with »visiwinnet – Lenze c300 User Manual

Page 120

background image

Lenze · Controller | Parameter setting & programming · Reference Manual · DMS 1.5 EN · 04/2014 · TD17

120

12

Visualisation with »VisiWinNET®«

12.7

OPC tunnel for external visualisation (remote access)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

12.7

OPC tunnel for external visualisation (remote access)

12.7.1

Windows® CE operating system

[12-3] Remote access with one visualisation controller ("Visu") and one controller

The »VisiWinNET®« Runtime of the external

controller, Controller(Visu), accesses the OPC

servers of the control system Controller via the

OPC tunnels (1, 2).

Note!

There is no OPC server available for PROFIBUS and PROFINET.
Controller c300/p300:

• The OPC communication for »VisiWinNET« is exclusively available for Controller p300

without PLC.

• Otherwise, only the Lenze "Logic&Motion" direct driver can be used for the data

exchange between »VisiWinNET« and PLC.

This manual is related to the following products: