beautypg.com

4 functional test, Functional test, 4 electrical connection – JUMO 705060 mTRON T - Multifunction Panel 840 Operating Manual User Manual

Page 40

background image

4 Electrical connection

40

4.4

Functional test

Once the electrical connection is complete, the following points must be checked:
1) Voltage supply
2) Connection to system bus
3) Errors during initialization

Voltage supply

Connection to system bus

The "Bus In" input must be connected to a "Bus Out" output of a base unit or a router module.

Errors during initialization

If errors occur during the initialization, the user must monitor the configuration of the system
using the setup program and rectify errors.

Startup

The checks described above complete the process of installation and electrical connection. For
startup, use the additional documentation (operating manual or system manual).
The "Introduction" chapter of this document contains an overview of all documentation for the
measuring, control, and automation system.

If

Then

the voltage supply is present

the multifunction panel starts.

the screen shows a start picture.