beautypg.com

Lincoln Electric IM8000 CHECKPOINT User Manual

Page 165

background image

AvailabilityExample2

AppendixB.OverallEquipmentEfficiencyExamples

IM8000

CheckPoint™UserManual

B.3

TimeStamp

Status

Duration

TimeinPlannedDowntime

TimeNotinPlannedDowntime

3:00PM

Disconnected

3603

0

3603

4:00PM

Disconnected

3603

3603

0

* Alltimeslistedinseconds.

Availability for Each Hour

CalculatingtheAvailabilityfactorforeachhourresultsinthefiguresinTable14.4.Rememberthatwhen
theAssetScheduledTimeisequaltothePlannedDowntime,Availabilityis0%(e.g.,11:00AMinTable
14.4).

Table14.4

AvailabilityFactorforEachHour*

Hour

Disconnected
Time

AssetSched.
Time

Planned
Downtime

Planned
Prod.Time

Unplanned
Downtime

Operating
Time

Availability

6:00AM

3603

0

0

0

0

0

0%

7:00AM

3602

0

0

0

0

0

0%

8:00AM

3603

0

0

0

0

0

0%

9:00AM

3602

0

0

0

0

0

0%

10:00AM

3583

0

0

0

0

0

0%

11:00AM

1811

1791

1791

0

0

1791

0%

12:00PM

3603

0

0

0

0

0

0%

1:00PM

3602

0

0

0

0

0

0%

2:00PM

3601

0

0

0

0

0

0%

3:00PM

3603

0

0

0

0

0

0%

4:00PM

0

3603

3603

0

0

3603

0%

* Alltimeslistedinseconds.

Availability for the Entire Shift

TocalculatetheAvailabilityfortheentireshift,youusethetotalsfromthevarioustimecolumnswiththe
followingresults.

Disconnected
Time

AssetScheduled
Time

Planned
Downtime

PlannedProduction
Time

Unplanned
Downtime

Operating
Time

Availability

34213

5394

5394

0

0

5394

0%