Chapter 12. Limit Errors Tab

IM8000

CheckPoint™ User Manual

12.3

the Welding Power Source or the Container you have selected in the Asset Tree. Table 12.1 explains the
criteria in more detail.

Figure 12.4 Criteria for the Limit Errors – Custom Report

Table 12.1

Criteria Available on the Limit Errors – Custom Report

Field

Description

Start Date and
End Date

Select a date range in which the weld(s) were performed for the profile data you want
to review. Welds completed within this date range (that also occurred during the shift
you select) appear in the resulting report.

TIP |

You can type the date into the field, or you can click the calendar icon ( )

next to the field to display an interactive calendar where you can click on the date
you want. Use the arrow icons ( and ) to navigate to previous or future months.
The double arrow icons ( and ) move forward and backward by three-month
intervals.

Shift

If you want to see error data for welds performed during a specific shift over the date
range you chose, select that shift from the Shift drop-down. CheckPoint™ narrows the
data to include only welds performed during the times of that shift. The CheckPoint™
administrator configured the shifts in the CheckPoint™ Manager.

Group By

The Group By drop-down allows you to set the report to display data in year, months,
days, hours or shifts.

For example, if you select Hour from the Group By drop-down and the Shift you select
is for a single eight-hour shift, the graph will show data for each individual eight hours.