Chapter 9. Overall Equipment Efficiency (OEE)
Calculations of OEE in CheckPoint™
9.6 CheckPoint™
User
Manual
IM8000
You can further break this equation down into:
ܣݒ݈ܾ݈ܽ݅ܽ݅݅ݐݕ =
൫(ܣݏݏ݁ݐ ݄ܵܿ݁݀ݑ݈݁݀ ܶ݅݉݁ െ ݈ܲܽ݊݊݁݀ ܦݓ݊ݐ݅݉݁ ) െ ܷ݈݊ܽ݊݊݁݀ ܦݓ݊ݐ݅݉݁൯
(ܣݏݏ݁ݐ ݄ܵܿ݁݀ݑ݈݁݀ ܶ݅݉݁ െ ݈ܲܽ݊݊݁݀ ܦݓ݊ݐ݅݉݁)
For example, at Advanced Manufacturing, John wanted to see his Overall Equipment Efficiency (OEE) for
last Friday’s evening shift on a production line he’s watching. He clicked the Line 1 Container in the Asset
Tree, clicked the OEE tab and generated a custom OEE report, setting the specific date, selecting the
Evening shift and selecting to group the report by hour. This displays the OEE figures for each hour in the
Evening shift.
Figure 9.7 Availability Example
CheckPoint™ calculated the Availability factor for each hour of the shift for the K2803-1 PW AC/DC 1000 SD
welder in Figure 9.7 using the data in Table 9.1 below . *
All times listed in minutes.
Table 9.2 on page 9.6 explains each of the equation variables in more detail.
Table 9.1
Data Used in Availability Example *
Hour
Disconnected
Time
Asset Scheduled
Time
Planned
Downtime
Planned
Prod. Time
Unplanned
Downtime
Operating
Time
Avail.
2:00 PM
29
31
0
31
1
30
97%
3:00 PM
30
30
0
30
25
5
17%
4:00 PM
0
60
0
60
45
15
25%
5:00 PM
0
45
15
30
0
20
67%
6:00 PM
10
50
30
20
20
0
0%
7:00 PM
60
0
0
0
0
0
0%
8:00 PM
25
35
10
25
5
20
80%