beautypg.com

Yokogawa Multi Channel Oxygen Analyzer System ZR22/AV550G User Manual

Page 11

background image

ix

IM 11M12D01-01E

3.1.7 Detector with a probe protector

(Model ZO21R-L-

ᮀᮀᮀ-ᮀ *B for dust wear protect ............................ 3-5

3.2

Installation of the Detector (Model ZR22G-015) ........................................... 3-6

3.2.1

Installation Location ................................................................................ 3-6

3.2.2

Usage of the High-temperature Probe Adapter (Model ZO21P-H) ....... 3-6

3.2.3

Probe Insertion Hole ................................................................................ 3-7

3.2.4

Mounting of the High-Temperature Detector ......................................... 3-8

3.3

Installation of the Averaging Converter ......................................................... 3-9

3.3.1

Installation Location .............................................................................. 3-10

3.3.2

Installation in an Instrument Panel ....................................................... 3-10

3.3.3 Outdoor Installation ............................................................................. 3-12

3.4

Installation of ZA8F Flow Setting Unit ....................................................... 3-13

3.4.1

Location ................................................................................................. 3-13

3.4.2

Mounting of ZA8F Flow Setting Unit .................................................. 3-13

3.5

Installation of the Calibration Gas Unit Case .............................................. 3-15

3.5.1

Location ................................................................................................. 3-15

3.5.2

Mounting ................................................................................................ 3-15

4. Piping ............................................................................................................................. 4-1

4.1

Piping for a System Using Flow Setting Units for Manual Calibration ........ 4-1

4.1.1

Parts Required for Piping in a System Using Flow Setting Units
for Manual Calibration ............................................................................ 4-3

4.1.2

Piping for the Calibration Gases ............................................................. 4-3

4.1.3

Piping for the Reference Gas .................................................................. 4-4

4.1.4

Piping to the High Temperature Probe Adapter ..................................... 4-4

4.1.5

Piping for Blowback ................................................................................ 4-6

4.1.6

Piping for Indication check ..................................................................... 4-7

4.1.7

Piping to Introduce Purge Gas When a Process Gas Alarm Occurs ...... 4-8

4.2

Piping for a System to Perform Automatic Calibration ................................. 4-9

4.2.1

Parts Required for Piping in a System to Perform Automatic
Calibration ............................................................................................. 4-10

4.2.2

Piping for the Calibration Gases ........................................................... 4-11

4.2.3

Piping for the Reference Gas ................................................................ 4-12

4.2.4

Piping to the High Temperature Probe Adapter ................................... 4-12

4.2.5 Piping for Blowback ............................................................................. 4-12
4.2.6 Piping for Indication Check ................................................................. 4-12
4.2.7

Piping to Introduce Purge Gas When a Process Gas Alarm Occurs .... 4-13

5. Wiring ........................................................................................................................... 5-1

5.1

General ............................................................................................................ 5-1

5.1.1

Wiring Precautions .................................................................................. 5-2

5.1.2

Wiring Holes ........................................................................................... 5-4

5.1.3

External Wiring Connection Terminals of the Averaging Converter .... 5-4

5.1.4

Types of Wiring and Cables ................................................................... 5-5

5.2

Wiring for the Averaging Converter and Peripheral Devices ........................ 5-6

5.2.1

Preparation for Wiring to the Averaging Converter ............................... 5-6

5.2.2

Preparation for Wiring to Detectors ........................................................ 5-6

5.2.3

Power and Ground Wiring ...................................................................... 5-8

5.2.4

Power Wiring to Detector Heaters .......................................................... 5-8

5.2.5

Signal Wiring to Detectors .................................................................... 5-10

5.2.6

Ground Wiring of Detectors .................................................................. 5-11

5.2.7

Wiring for Individual and Average Concentration Analog Outputs .... 5-12