beautypg.com

Execution/setup, Calibration, Indication check – Yokogawa Multi Channel Oxygen Analyzer System ZR22/AV550G User Manual

Page 107: Blow back

background image

IM 11M12D01-01E

6-9

6. Components

4) Execution/Setup display

Touch the Setup key on the basic panel display. The Execution/Setup display will
appear. From the menu items — calibration, indication check, blow back, maintenance,
or commissioning, select the desired item to perform.

Enter

Execution/Setup

Calibration

Indication check

Blow back

Setup

Maintenance

Commissioning

F06E.EPS

Execution

Figure 6.10 Execution/Setup Display

5) Calibration display

From the menu on the Execution/Setup display, select Calibration. The Calibration
display will appear. Calibration can be performed from the menu on this display.

Enter

Manual calibration

Semi-auto calibration

F07E.EPS

Calibration

Figure 6.11 Calibration Display

6) Indication check display

From the menu on the Execution/Setup display, select Indication Check. The Indication
Check display will appear. Indication check can be performed from the menu on this
display.

7) Blow back display

From the menu on the Execution/Setup display, select Blow back. The Blow back
display will appear. Blow back can be performed from the menu on this display.

Enter

Manual ind. check

Semi-auto ind. check

F08E.EPS

Indication check

Enter

Start blow back

Cancel blow back

F09E.EPS

Blow back