Call scheduling, 1 introduction to call scheduling, Chapter 41 call scheduling – ZyXEL Communications ZyXEL ZyWALL 5 User Manual
Page 522: Figure 332 schedule setup, Chapter, Chapter 41

ZyWALL 5 User’s Guide
Chapter 41 Call Scheduling
521
C
H A P T E R
41
Call Scheduling
Call scheduling allows you to dictate when a remote node should be called and for how long.
41.1 Introduction to Call Scheduling
The call scheduling feature allows the ZyWALL to manage a remote node and dictate when a
remote node should be called and for how long. This feature is similar to the scheduler in a
videocassette recorder (you can specify a time period for the VCR to record). You can apply
up to 4 schedule sets in Menu 11.1 - Remote Node Profile. From the main menu, enter 26
to access Menu 26 - Schedule Setup as shown next.
Figure 332 Schedule Setup
Lower numbered sets take precedence over higher numbered sets thereby avoiding scheduling
conflicts. For example, if sets 1, 2, 3 and 4 are applied in the remote node, then set 1 will take
precedence over set 2, 3 and 4 as the ZyWALL, by default, applies the lowest numbered set
first. Set 2 will take precedence over set 3 and 4, and so on.
You can design up to 12 schedule sets but you can only apply up to four schedule sets for a
remote node.
Note: To delete a schedule set, enter the set number and press [SPACE BAR] and
then [ENTER] or [DEL] in the Edit Name field.
Menu 26 - Schedule Setup
Schedule Schedule
Set # Name Set # Name
------ ------------------ ------ ------------------
1 _________________ 7 _________________
2 _________________ 8 _________________
3 _________________ 9 _________________
4 _________________ 10 _________________
5 _________________ 11 _________________
6 _________________ 12 _________________
Enter Schedule Set Number to Configure= 0
Edit Name= N/A
Press ENTER to Confirm or ESC to Cancel: