beautypg.com

Drive start-up preparation, Drive start-up preparation -2 – Yaskawa F7 Drive User Manual User Manual

Page 87

background image

Start-Up 4 - 2

Drive Start-Up Preparation

In order to provide the most reliable Drive available and to avoid any extra costs related to loss or reduction of warranty
coverage, an authorized Yaskawa service representative should complete this start-up procedure. Please complete the
following checklist and maintain it in a secure location as technical service personnel may request information from this
checklist.

Drive Start-Up Preparation

Date:

Start-Up Person:

Company Name: _________________________________

Start-Up Location: _________________________________

Sales Order #: ___________________________________

Serial #: ________________________________________

Printed Name: ___________________________________

Drive Location: ___________________________________

Phone #: _______________________________________

Signature: ________________________________________

Owners Representative:

Printed Name: ___________________________________

Phone #: _________________________________________

Company: ______________________________________

Signature: ________________________________________

Step

1. The Drive is thoroughly tested at the factory. The start-up person should verify that the Drive is free of shipping and

installation damage. Shipping damage is not covered by the Yaskawa warranty. Claims must be filed with the
shipping company as soon as possible for any potential recovery via insurance.

2. Review the F7 User Manual (TM.F7.01) shipped with the Drive.

3. Verify that the model number and voltage ratings in the purchase order match the nameplate data for each unit.

4. Location of the Drive is important to achieve proper performance and normal operating life. The unit should be

installed in an area where it is protected from:

Direct sunlight, rain or moisture
Corrosive gases or liquids
Vibration, airborne dust or metallic particles

5. Ensure the Drive is on a vertical surface with adequate space for air circulation (4.75” above and below, 1.2” on each

side). Refer to Fig 1-8.

6. Verify that the proper branch circuit protection is installed in front of the Drive. Refer to Appendix E - Peripheral

Devices for proper input fuse or circuit breaker sizing.