Installation requirements, Noise levels, Placement of system components – Hypertherm HyIntensity Fiber Laser Rev.3 User Manual
Page 50: Installation requirements -2, Noise levels -2 placement of system components -2

InstallatIon
2-2
HyIntensity Fiber Laser
Instruction Manual – 807090 Revision 3
Installation requirements
All installation and service of the electrical and plumbing systems must conform to national and local
electrical and plumbing codes. this work should be performed only by qualified, licensed personnel.
Direct any technical questions to the nearest Hypertherm Technical Service Department listed in the front of this manual,
or your authorized Hypertherm distributor.
Noise levels
Acceptable noise levels as defined by national and local codes may be exceeded by this laser system. Always wear
proper ear protection when cutting. Any noise measurements taken are dependant on the specific environment in which
the system is used. See also Noise can damage hearing in the Safety section of this manual. Specific information by
product can be found in the Hypertherm downloads library at:
https://www.hypertherm.com/Xnet/library/DocumentLibrary.jsp
Select the product you are looking for from the Product Type drop down menu, choose “Regulatory” from the Category
drop down menu, and choose “Acoustical Noise Data Sheets” from the Sub Category drop down menu. Hit Submit.
Placement of system components
• Place all system components in position prior to making electrical, gas, and interface connections. Use the
diagram in this section for component-placement guidelines.
• Ground all system components to earth. See Recommended grounding and shielding practices in this section
for details.
• To prevent leaks in the system, tighten all gas and water connections as shown below:
torque specifications
Gas or water
hose size
kgf – cm
lbf – in
lbf – ft
Up to 10 mm (3/8 in)
8.6 – 9.8
75 – 85
6.25 – 7
12 mm (1/2 in)
41.5 – 55
360 – 480
30 – 40