beautypg.com

Summary (ethersam) – EXFO FTB/IQS-85100G Packet Blazer for FTB-500/IQS-600 User Manual

Page 244

background image

Test Results

234

FTB/IQS-85100G

Summary (EtherSAM)

Summary (EtherSAM)

From the Test menu, tap Results, and the Summary tab.

Note: For Dual Test Set, only Start Time is displayed on the remote module.

Service Configuration/Performance Test Status indicates the actual
test status as follows:

The pas/fail verdict icon is displayed next to the test status when
enabled. A fail verdict is declared when a Link Down or LOS is
detected, or when any SLA parameter fails.

Start Time indicates the date and time the test has been started. The
date and time is reset every time the test is restarted or reset.

Remote unit in use and locked for Dual Test Set indicates that this
module is used for Dual Test Set as the remote module.

Test Status

Description

“--”

Test has not started.

Disabled

Test/subtests is/are disabled.

Running

Test/subtest is currently running.

Data Transfer

Test/subtest is running but no test traffic is being transmitted.

Completed, Test/subtest has completed with the test pass/fail verdict.
Aborted, <reason>

Test/subtest has been aborted either manually (Stop) or
automatically from an alarm and the reason why the test has
been aborted is also displayed as follows:
Link down alarm, LOS alarm, Timeout during execution,
DTS connection failed, Invalid Configuration (DTS),
Loss of remote connection (DTS), Unresolved addresses,
No test enabled, Invalid Burst Configuration,
CIR disabled for all services, Excessive Refill Time

a

,

Stopped

a.

An excessive refill occurs when the pre-burst and/or post-burst duration last for

more than 2 seconds.