3 getting started, Inserting and removing test modules, Turning on the unit – EXFO FTB/IQS-85100G Packet Blazer for FTB-500/IQS-600 User Manual
Page 17: Starting the module application, 3getting started, Aution, Arning
Packet Blazer
7
3
Getting Started
If the FTB/IQS-85100G Packet Blazer has been purchased at the same time
as the platform, the FTB/IQS-85100G module is pre-installed with the
appropriate software version.
Inserting and Removing Test Modules
Note: Refer to the platform user guide for more information on how to insert a
module into the platform or to remove a module from the platform.
Turning On the Unit
Turn on the platform. Refer to the platform platform user guide for more
information.
Starting the Module Application
The module can be configured and controlled by starting
the FTB/IQS-85100G Packet Blazer application.
From ToolBox (FTB-500) or IQS Manager (IQS-600), tap the
FTB/IQS-85100G Packet Blazer button to start the application.
C
AUTION
Never insert or remove a module while the platform and its
expansion units (IQS-600) are turned on. This will result in
immediate and irreparable damage to both the module and
platform.
W
ARNING
When the laser safety light (
) is flashing on the platform, at
least one of your modules is emitting an optical signal. Please check
all modules, as it might not be the one you are currently using.