beautypg.com

0 electrical and wiring (cont’d), 5 control wiring (field-installed) (cont’d), 2 specific wiring by control option (cont’d) – Reznor ZQYRA Unit Installation Manual User Manual

Page 20: Sensor, option cn7b, Figure 23 - option cn7b, co, Sensor switch and wiring connections, Time clock wall switch, option cn7a (cont’d), The co, Level (±50 ppm). when in auto, the co

0 electrical and wiring (cont’d), 5 control wiring (field-installed) (cont’d), 2 specific wiring by control option (cont’d) | Sensor, option cn7b, Figure 23 - option cn7b, co, Sensor switch and wiring connections, Time clock wall switch, option cn7a (cont’d), The co, Level (±50 ppm). when in auto, the co | Reznor ZQYRA Unit Installation Manual User Manual | Page 20 / 72 0 electrical and wiring (cont’d), 5 control wiring (field-installed) (cont’d), 2 specific wiring by control option (cont’d) | Sensor, option cn7b, Figure 23 - option cn7b, co, Sensor switch and wiring connections, Time clock wall switch, option cn7a (cont’d), The co, Level (±50 ppm). when in auto, the co | Reznor ZQYRA Unit Installation Manual User Manual | Page 20 / 72